Using tools like MathCAD, it’s possible to calculate the pulse by pulse switching parameters of the converter, using these parameters and the derived inductor value. The ripple current, the MOSFET duty cycle and diode duty cycle should be calculated under the low line conditions. While the average current of the diode is not very high, due to the extreme duty cycle difference, the peak diode current is quite high, being the same as that of the peak inductor ripple current and MOSFET switch current. This illustrates the stress on the diode, and why Boost diode selection is a critical factor in the CCM PFC design.
 
                 
                 
                 
 
 
 
 Settings
        Settings
     Fast Delivery
                                    Fast Delivery
                                 Free Shipping
                                    Free Shipping
                                 Incoterms
                                    Incoterms
                                 Payment Types
                                    Payment Types
                                





 Marketplace Product
                                    Marketplace Product
                                 
             
                     
                                 
                                 
                                 
                         
                                 
                                 
                                 
                                 
                                 
                                 
                                 Thailand
Thailand